Which scaffolding system do you want to configure?
Both systems offer high quality and safety. Choose RLS for speed and flexibility, or RMS for maximum load capacity and robustness.
RLS
Rix Lineair Safety
Characterized by the minimal number of lightweight components. With the RLS system, a maximum scaffolding can be assembled with minimal time.
Why choose RLS?
Commonly used by:
Ideal for: Renovation and maintenance work where speed and flexibility are important.
RMS
Rix Modulair System
The RMS system is known for its flexibility and robustness. Thanks to its hot-dip galvanized finish and a load-bearing capacity of up to 450 kg per m².
Why choose RMS?
Commonly used by:
Ideal for: Heavy constructions in construction, shipbuilding and events where maximum loads are required.
Any Questions About Which System to Choose?
Our experts are happy to help you choose the right scaffolding system for your specific project.